|
|
|
|||
| IOP Journals Home | IOP Journals List | EJs Extra | This Journal | Search | Authors | Referees | Librarians | User Options | Help | | ||||
2001 Nucl. Fusion 41 567-573 doi: 10.1088/0029-5515/41/5/309
![]()
|
||||
Abstract. The National Ignition Facility (NIF) is the largest construction project ever undertaken at Lawrence Livermore National Laboratory (LLNL). The NIF consists of 192 40 cm square laser beams and a 10 m diameter target chamber. The NIF is being designed and built by an LLNL led team from Los Alamos National Laboratory, Sandia National Laboratories, the University of Rochester and LLNL. Physical construction began in 1997. The Laser and Target Area Building and the Optics Assembly Building were the first major construction activities, and despite several unforeseen obstacles, the buildings are now 92% complete and have been built on time and within cost. Prototype component development and testing has proceeded in parallel. Optics vendors have installed full scale production lines and have performed prototype production runs. The assembly and integration of the beampath infrastructure have been reconsidered and a new approach has been developed. The article discusses the status of the NIF project and the plans for completion.
Print publication: Issue 5 (May 2001)| Post to CiteUlike | | Post to Connotea | | Post to Bibsonomy |
|
Setup information is available for Adobe Acrobat and Gzip compressed
PostScript. EndNote, ProCite ® and Reference Manager ® are registered trademarks of ISI Researchsoft. Copyright © Institute of Physics and IOP Publishing Limited 2009. Use of this service is subject to compliance with the Terms and Conditions of use. In particular, reselling and systematic downloading of files is prohibited. Help: Cookies | Data Protection. Privacy policy Disclaimer |
|
| |